If the cost estimate for a project is a basis for contract awards and performance reporting, it should be a(n) estimate and as accurate as possible. select one:
a. rough order of magnitude
b. definitive
c. budgetary
d. analogous

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 21.06.2019 22:00, coltonwsmith
In 1980, alfa romeo introduced the first system to smooth a rough idle caused by ignition and camshaft timing changes.
Answers: 1
image
Physics, 22.06.2019 06:30, marciamwilliamp31fz6
The energy of a photon was found to be 3.38 × 10–19 j. planck’s constant is 6.63 × 10–34 j • s. which color of light corresponds to this photon?
Answers: 2
image
Physics, 22.06.2019 08:30, katiemh8302
A17,250 kg rocket is pushed with a thrust of 6,450,284 n. what is the acceleration of the rocket?
Answers: 1
image
Physics, 22.06.2019 14:20, jadahilbun01
A1-lb collar is attached to a spring and slides without friction along a circular rod in a vertical plane. the spring has an undeformed length of 5 in. and a constant k =25 lb/ft. knowing that the collar is released from being held at a determine, the speed of the collar and the normal force between the collar and the rod as the collar passes through b.
Answers: 3
Do you know the correct answer?
If the cost estimate for a project is a basis for contract awards and performance reporting, it shou...

Questions in other subjects: