Mathematics
Mathematics, 26.08.2019 16:30, dragongacha777

Lincoln had two books in his backpack one book had a mass of 3 lbs. 7 oz. and the other book had a mass of 2 lbs. 10 oz. what was the total mass in ounces of the book
a 60
b 77
c 80
d 97

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:30, love123jones
Una caja de galletas contiene 16 paquetes y cada una de estas tiene 12 galletas y se quieren repartir entre 6 niños ¿de cuantas galletas le toca a cada niño?
Answers: 1
image
Mathematics, 21.06.2019 19:40, Candieboo4006
It appears that people who are mildly obese are less active than leaner people. one study looked at the average number of minutes per day that people spend standing or walking. among mildly obese people, the mean number of minutes of daily activity (standing or walking) is approximately normally distributed with mean 376 minutes and standard deviation 64 minutes. the mean number of minutes of daily activity for lean people is approximately normally distributed with mean 528 minutes and standard deviation 107 minutes. a researcher records the minutes of activity for an srs of 7 mildly obese people and an srs of 7 lean people. use z-scores rounded to two decimal places to answer the following: what is the probability (image for it appears that people who are mildly obese are less active than leaner people. one study looked at the averag0.0001) that the mean number of minutes of daily activity of the 6 mildly obese people exceeds 420 minutes? what is the probability (image for it appears that people who are mildly obese are less active than leaner people. one study looked at the averag0.0001) that the mean number of minutes of daily activity of the 6 lean people exceeds 420 minutes?
Answers: 1
image
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
image
Mathematics, 21.06.2019 22:30, bobxspam
Varies inversely with x. if y=8.5 when x=-1 find x when y=-1
Answers: 1
Do you know the correct answer?
Lincoln had two books in his backpack one book had a mass of 3 lbs. 7 oz. and the other book had a m...

Questions in other subjects: