There is a machine shop with only one machine. Arrival rate to the shop is 10 parts per hour on average. The average machining time is 5 minutes per part. The machine shop is considering replacing the old machine with a new high speed machine, which is expected to reduce machining time by 20% (4 minutes per part). Also, the shop is expecting attracting 20% more customers (12 parts per hour), with the new machine. Compare the expected time in the shop for each part with the old and with the new machine. How much % can we reduce the time in the shop by introducing the new machine?
Answers: 2
Mathematics, 21.06.2019 23:30, meiyrarodriguez
Write an inequality for this sentence the quotient of a number and -5 increased by 4 is at most 8
Answers: 1
Mathematics, 22.06.2019 05:00, cheerkennedym2594
Which number is composite a.9 b.5 c.11 d.2
Answers: 2
There is a machine shop with only one machine. Arrival rate to the shop is 10 parts per hour on aver...
Mathematics, 12.02.2021 09:30
Mathematics, 12.02.2021 09:30
History, 12.02.2021 09:30
Mathematics, 12.02.2021 09:30
Chemistry, 12.02.2021 09:30
Mathematics, 12.02.2021 09:30