Mathematics
Mathematics, 25.04.2020 04:25, nculberson6

A major manufacturing firm producing PCB for electrical insulation discharges small amounts from the plant. We assume that the amount of PCB discharge per water specimen is normally distributed. Production will be halted if there is evidence that the mean PCB amount discharged in the water exceeds 3 ppm (parts per million). A random sample of 16 water specimens produced x= 3.2 ppm and a sample standard deviation s= 0.3.
(a) Do these statistics provide sufficient evidence to halt the process? Use a=0.05.
(b) Briefly discuss the consequences of type I and type II errors. From your point of view, which of the two errors is the most serious?
(c) Construct a 90% confidence interval for the true mean PCB amount discharged in the water.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:00, dianaherrera041
The composite figure is made up of a parallelogram and a rectangle. find the area. a. 76 sq. units b. 48 sq. units c. 124 sq. units d. 28 sq. units
Answers: 1
image
Mathematics, 21.06.2019 15:30, dolliemeredithm
Guests at an amusement park must be at least 54 inches tall to be able to ride the roller coaster. which graph represents the set of heights that satisfy this requirement?
Answers: 3
image
Mathematics, 21.06.2019 17:30, CAPEPOPPA
Average acceleration: i have no idea how to do this.
Answers: 1
image
Mathematics, 21.06.2019 23:30, Omarrdz214
Robin spent 25% more time on his research project than he had planned he’s been an extra h ours on the project which of the following expressions could represent the number of hours rob actually spent on the project
Answers: 3
Do you know the correct answer?
A major manufacturing firm producing PCB for electrical insulation discharges small amounts from the...

Questions in other subjects:

Konu
Physics, 30.01.2020 02:03