Mathematics, 25.04.2020 01:03, dsteele3642
A small manufacturing plant produces two kinds of bicycles—single speed and ten-speed. The plant can manufacture up to 400 of the single speed bicycles and up to 500 of the ten-speed bicycles per month, but it can only manufacture a total of 650 of both kinds every month. It takes 40 man-hours to manufacture a single-speed bicycle and 80 man-hours for the ten-speed; there are 44,000 man-hours available per month. The profit on a single-speed bicycle is $20 and the profit on a ten-speed bicycle is $30.
Determine the production schedule that will maximize the total monthly profit z from the manufacture and sale of x single speed and y ten-speed bicycles.
Answers: 3
Mathematics, 21.06.2019 15:00, FlayMaster101
Answer soon(fast) 15 pts-brainliest? for right answer with small explination a restaurant catered a party for 40 people. a child’s dinner (c) cost $11 and an adult’s dinner (a) cost $20. the total cost of the dinner was $728. how many children and adults were at the party? use the table to guess and check.(i couldn't get the graph onto the question) 8 children and 32 adults9 children and 31 adults10 children and 30 adults12 children and 28 adults
Answers: 1
Mathematics, 21.06.2019 15:20, 1xXJOKERXx3
Given: f(x) = 2x + 5 and g(x) = x2 and h(x) = -2x h(g(f( = x2+ vx+ x + y
Answers: 3
Mathematics, 21.06.2019 21:00, Sadaalcala1
Ade and abc are similar. which best explains why the slope of the line between points a and d is the same as the slope between points a and b?
Answers: 2
A small manufacturing plant produces two kinds of bicycles—single speed and ten-speed. The plant can...
English, 11.04.2020 04:51