Mathematics
Mathematics, 30.03.2020 21:34, ashleewilson9204

Battery packs in electric go-carts need to last a fairly long time. The run-times (time until it needs to be recharged) of the battery packs made by a particular company are Normally distributed with a mean of 2 hours and a standard deviation of 0.33 hour (i. e., 20 minutes). Battery packs that have a run-time in the highest 10% of the run-time distribution are highly sought-after by go-cart drivers. What is the minimum level for which the battery pack will be classified as highly sought-after class

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, rwlockwood1
Find the sum of 4x^{2} -4+6 and -7^{2} +3x+1
Answers: 2
image
Mathematics, 21.06.2019 18:30, bellabarfield4286
The u-drive rent-a-truck company plans to spend $13 million on 320 new vehicles. each commercial van will cost $25 comma 000, each small truck $50 comma 000, and each large truck  $80 comma 000. past experience shows that they need twice as many vans as small trucks. how many of each type of vehicle can they buy?
Answers: 1
image
Mathematics, 21.06.2019 23:00, Pankhud5574
Is a square always, sometimes, or never a parallelogram
Answers: 2
image
Mathematics, 22.06.2019 02:00, CJunc95801
The statement tan theta= -12/5, csc theta=-13/12, and the terminal point determained by theta is in quadrant two
Answers: 3
Do you know the correct answer?
Battery packs in electric go-carts need to last a fairly long time. The run-times (time until it nee...

Questions in other subjects:

Konu
Mathematics, 26.09.2021 14:20
Konu
Biology, 26.09.2021 14:20
Konu
Mathematics, 26.09.2021 14:20
Konu
English, 26.09.2021 14:20