Mathematics
Mathematics, 20.03.2020 23:58, lolz55678

A quality engineer samples 100 steel rods made on mill A and 150 rods made on mill B. Of the rods from mill A, 88 meet specifications, and the rods from mill B, 135 meet specifications.

a) Estimate the proportion of rods from mill A that meet specifications, and find the uncertainty in the estimate.

b) Estimate the proportion of rods from mill B that meets specifications, and find the uncertainty in the estimate.

c) Estimate the difference between the proportions, and find the uncertainty in the estimate.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, hejdiidid9311
Will used 20 colored tiles to make a design in art class. 5/20 of his tiles were red. what is an equivalent fraction for the red tiles?
Answers: 1
image
Mathematics, 21.06.2019 18:00, lclaudettecarte3550
Find the number of real number solutions for the equation. x2 + 5x + 7 = 0 0 cannot be determined 1 2
Answers: 2
image
Mathematics, 21.06.2019 18:40, 25jzaldivar
This stem-and-leaf plot represents the heights of the students on ralph's basketball team. one student's height is missing from the plot. if the mean height of all the students on the team is 61 inches, what is the missing height? a. 55 in. b. 59 in. c. 61 in. d. 65 in.
Answers: 2
image
Mathematics, 21.06.2019 21:30, drepeter86
50 people men and women were asked if they watched at least one sport on tv. 20 of the people surveyed are women, but only 9 of them watch at least one sport on tv. 16 of the men watch at least one sport on tv. make a a two-way table and a relative frequency table to represent the data.
Answers: 3
Do you know the correct answer?
A quality engineer samples 100 steel rods made on mill A and 150 rods made on mill B. Of the rods fr...

Questions in other subjects:

Konu
English, 23.12.2019 22:31