Mathematics
Mathematics, 04.02.2020 03:43, JvGaming2001

Aconstruction crew has just finished building a road. the crew worked for 2 and 4/5 days. if they built 3 and 2/7 kilometers of road each day, what is the total length of road they built?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, snowflakekitty001
16 more than the product of 5 and p
Answers: 3
image
Mathematics, 21.06.2019 18:30, sakria2002
What can each term of the equation be multiplied by to eliminate the fractions before solving? x – + 2x = + x 2 6 10 12
Answers: 1
image
Mathematics, 21.06.2019 19:00, jamilamiller200
Solve 3x-18=2y and 5x-6y=6 by elimination show work
Answers: 2
image
Mathematics, 21.06.2019 22:30, skylarjane1030
9.4.34  question   to estimate the height of a stone  figure, an observer holds a small square up to her eyes and walks backward from the figure. she stops when the bottom of the figure aligns with the bottom edge of the  square, and when the top of the figure aligns with the top edge of the square. her eye level is 1.811.81 m from the ground. she is 3.703.70 m from the figure. what is the height of the figure to the nearest hundredth of a  meter?
Answers: 1
Do you know the correct answer?
Aconstruction crew has just finished building a road. the crew worked for 2 and 4/5 days. if they bu...

Questions in other subjects:

Konu
Mathematics, 13.03.2020 03:54