A retrofitted space-heating system is being considered for a small office building. The system can be purchased and installed for $120,000, and it will save an estimated 300,000 kilowatt-hours (kWh) of electric power each year over a six-year period. A kilowatt-hour of electricity costs $0.10, and the company uses a MARR of 15% per year in its economic evaluations of refurbished systems. The market value of the system will be $8,000 at the end of six years, and additional annual operating and maintenance expenses are negligible. Use the benefit–cost method to make a recommendation.

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, viicborella
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
image
Engineering, 04.07.2019 18:10, jadeochoa4466
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
image
Engineering, 04.07.2019 18:20, alexis9263
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms