Calculate the distance to be laid out using the following
data:
tape length - 100.015 ft.
slope - zenith 87 degrees 15' minutes
temperature - 64 degrees fahrenheit
required horizontal distance - 400ft.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
image
Engineering, 04.07.2019 18:10, jojoangelique13
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
image
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12ยฐ, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
image
Engineering, 04.07.2019 19:20, dndndndnxmnc
The process in which the system pressure remain constant is called a)-isobaric b)-isochoric c)-isolated d)-isothermal
Answers: 3
Do you know the correct answer?
Calculate the distance to be laid out using the following
data:
tape length - 100.015 f...

Questions in other subjects:

Konu
English, 29.02.2020 23:19