Business
Business, 18.10.2021 22:30, lucywood2024

Stock A has a beta of .69 and an expected return of 9.27 percent. Stock B has a beta of 1.13 and an expected return of 11.88 percent. Stock C has a beta of 1.48 and an expected return of 15.31 percent. Stock D has a beta of .71 and an expected return of 8.79 percent. Lastly, Stock E has a beta of 1.45 and an expected return of 14.04 percent. Which one of these stocks is most accurately priced if the risk-free rate of return is 3.6 percent and the market rate of return is 10.8 percent?

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 16:40, jojo171717
Based on what you learned about time management which of these statements are true
Answers: 1
image
Business, 22.06.2019 19:00, sharri44
Read the scenario. alfonso is 19 years old and has a high school diploma. recently, he was promoted to assistant manager at the fast-food restaurant where he has worked since the age of sixteen. his dream is to become the restaurant’s manager. what is his best option for achieving his dream? he should find another job and work his way up to a higher position. he should hope that his manager transfers to another location and that he is his replacement. he should attend classes at the local college to receive training in management. he should work hard, work longer hours, and remain assistant manager.
Answers: 2
image
Business, 22.06.2019 20:30, Arealbot
Afirm wants to hire a project manager (pm) at a salary of $100,000. 30% of pms have high ability, and 70% of pms have low ability. high ability pms generate $120,000 in revenue and low ability pms generate $80,000 in revenue. in addition to differences in productivity, high and low ability pms have different outside offers. if a high ability pm is not hired by the firm, she can work for another company at a salary of $80,000. if the low ability pm is not hired by the firm, she can work for another company for $70,000. high ability pms are also able to get a project management professional (pmp) certification at a cost of $1,000. low ability pms are unable to get a pmp certification (they would fail the test). the firm is not able to observe a pm’s ability, but is able to observe and verify whether or not the pm has a pmp certificate.(a) draw the extensive form of the game. expert answer
Answers: 3
image
Business, 23.06.2019 01:10, CarlsonB
1. alwaysrain irrigation, inc. would like to determine capacity requirements for the next four years. currently, two production lines are in place for making bronze and plastic sprinklers. three types of sprinklers are available in both bronze and plastic: 90-degree nozzle sprinklers, 180-degree nozzle sprinklers, and 360-degree nozzle sprinklers. management has forecast demand for the next four years as follows: both production lines can produce all the different types of nozzles. the bronze machines needed for the bronze sprinklers require two operators and can produce up to 12,000 sprinklers. the plastic injection molding machine needed for the plastic sprinklers requires four operators and can produce up to 200,000 sprinklers. three bronze machines and only one injection molding machine are available. what are the capacity requirements for the next four years? (assume that there is no learning.)
Answers: 1
Do you know the correct answer?
Stock A has a beta of .69 and an expected return of 9.27 percent. Stock B has a beta of 1.13 and an...

Questions in other subjects:

Konu
Mathematics, 29.01.2020 10:44
Konu
Computers and Technology, 29.01.2020 10:44