Advanced Placement (AP)

8. A machine producing a large spool of cable puts out 2.5 feet at a time. After each 2.5 feet of cable, there's a 1/1000 chance that the machine will cut the cable instead of continuing production. What is the expected length of the next
cable the machine produces?
a) 0.0025 ft. b) 400 ft. c) 2,500 ft. d) 6,250 ft. e)2,500,000 ft.

answer
Answers: 1

Other questions on the subject: Advanced Placement (AP)

image
Advanced Placement (AP), 23.06.2019 06:30, RandomLollipop
Ihave made a dive then stayed on the surface for a while. after this surface interval my pressure group is k. what is the maximum amount of bottom time available when doing a repetitive to 17/56 feet
Answers: 3
image
Advanced Placement (AP), 23.06.2019 20:00, almighty3120
Ill mark brainliest to whoever answers first correctly hurry! a vehicle's is the entire piece of plastic that spans the front end of the passenger cabin. a. instrument panel b. control panel c. dashboard d. frontboard
Answers: 1
image
Advanced Placement (AP), 23.06.2019 20:00, sarah7484
Who wants brainliest and free 15 points? answer this correctly and i will do so : ) if you imagine your steering wheel as a clock, which of the following is the ideal way to position your hands on the steering wheel? a. one hand on 6 o'clock b. one hand on 12 o'clock c. 10 and 2 o'clock d. 9 and 3 o'clock
Answers: 2
image
Advanced Placement (AP), 24.06.2019 07:30, xxaurorabluexx
Idon’t understand 8. plz ! we are finding the area of polygons. thx in advance!
Answers: 2
Do you know the correct answer?
8. A machine producing a large spool of cable puts out 2.5 feet at a time. After each 2.5 feet of ca...

Questions in other subjects: