Physics
Physics, 22.07.2019 20:00, lisacarter0804

A20.0 kg object is at rest, and then speeds up to 16.0 m/s. how much work was done on this system?

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 21.06.2019 23:30, reeseebaby89
You and a friend (alex) are at a a tree-top adventure park .. . part of the course requires you to climb up a rope. you both climb the same rope in the same amount of time. however, the tension in the rope is greater when alex climbs. who did the most work? alex did - more tension means more force - more force means more work was done you did - less tension means less force - less force means more work was done to find the work done, the force exerted and distance moved are multiplied. a couch is moved twice before you are happy with its placement. the same force was used to move the couch both times. if more work is done the first time it is moved, what do you know about the distance it was moved? when more work was done, the couch was moved less. when more work was done, the couch was moved further. when more work was done, the couch wasn't moved at all. when more work was done, the couch was moved the same distance.
Answers: 2
image
Physics, 22.06.2019 07:00, andrespiperderc
Suppose while hauling rocks, you accidentally drop one. it breaks apart in flat, planar sections. what type of rock did you just drop? 20 points
Answers: 3
image
Physics, 22.06.2019 10:00, omgomglol
Your town is considering building a biodiesel power plant describe at least two advantages and two disadvantages
Answers: 1
image
Physics, 22.06.2019 10:20, coollid876
What determines the amount of inertia an object has
Answers: 2
Do you know the correct answer?
A20.0 kg object is at rest, and then speeds up to 16.0 m/s. how much work was done on this system?...

Questions in other subjects:

Konu
Mathematics, 30.01.2020 18:45
Konu
Mathematics, 30.01.2020 18:45
Konu
Biology, 30.01.2020 18:45
Konu
Physics, 30.01.2020 18:45