Physics, 22.12.2021 01:20, hsjsjsjdjjd
A 500-kg elevator is pulled upward with a constant force of 5500 N for a distance of 30.0 m. What is the net work done on the elevator
Answers: 1
Physics, 22.06.2019 08:20, mimithurmond03
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
Physics, 22.06.2019 23:30, olivasm5626
Macy always thought there were only a few hair colors blonde brown and black however when she actually began looking around she saw varying shades of these hair color what is a possible reason for so many different hair colors
Answers: 1
A 500-kg elevator is pulled upward with a constant force of 5500 N for a distance of 30.0 m. What is...
Mathematics, 15.01.2022 09:30
English, 15.01.2022 09:30
Mathematics, 15.01.2022 09:30
Mathematics, 15.01.2022 09:30
History, 15.01.2022 09:30