Physics
Physics, 25.10.2021 14:00, harmony000011

WILL MARK BRAINLIEST A peregrine falcon dives at a pigeon. The
falcon starts downward from rest and falls
with free-fall acceleration.
If the pigeon is 77.2 m below the initial
position of the falcon, how long does the falcon
take to reach the pigeon? Assume that the
pigeon remains at rest. The acceleration of
gravity is 9.8 m/s.
Answer in units of s.

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 07:20, raemyiajackson1
Use the information presented in the graph to answer the questions. which segments show acceleration? which segment indicates that the object is slowing down? what is the velocity of segment b? what is the acceleration of segment b?
Answers: 3
image
Physics, 22.06.2019 08:20, mimithurmond03
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
image
Physics, 22.06.2019 12:00, connorhanratty6487
In an experiment, how can i change human errors? be specific.
Answers: 1
image
Physics, 22.06.2019 13:40, andrespiperderc
Use the profile illustrated for problem (1). assume that the layer of silty sand fill (sm) is placed over the entire site. estimate the thickness of the fill (h - in feet) that will cause the effective vertical stress at the center of the clay layer to increase by 517.5 pounds per square foot.
Answers: 1
Do you know the correct answer?
WILL MARK BRAINLIEST A peregrine falcon dives at a pigeon. The
falcon starts downward from r...

Questions in other subjects:

Konu
Mathematics, 04.07.2021 01:00
Konu
Mathematics, 04.07.2021 01:00