Answers: 3
Physics, 22.06.2019 13:10, jaeana
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
Physics, 23.06.2019 01:00, thinkerbelly157
Two positive charges are equal. which has more electric potential energy?
Answers: 1
Physics, 23.06.2019 08:00, JadedylaneH6980
Aball is rolled uphill a distance of 5 m before it slows, stops, and begins to roll back. the ball rolls downhill 9 m before coming to rest against a tree. what is the magnitude of the balls displacement? a. 4 meters b. 9 meters c. 14 meters d. 45 meters
Answers: 2
Find the mass of gravitational force half the distance between two objects by keeping the mass of th...
Mathematics, 25.02.2021 23:00
Mathematics, 25.02.2021 23:00
Mathematics, 25.02.2021 23:00
Mathematics, 25.02.2021 23:00