Physics
Physics, 29.01.2020 05:54, Dillpickle3322

By counting the number of crests that pass in a given amount of time, a person can calculate the

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 21.06.2019 19:30, BrodsterBj
Describe the path of a ray that approaches a mirror parallel to the principal axis.
Answers: 2
image
Physics, 22.06.2019 01:00, brian2913
An object is 10 cm from the mirror, its height is 1 cm and the focal length is 5 cm. what is the image height? (indicate the object orientation by including the + or - sign with the answer.) hi = cm +1 -1 +10 -10
Answers: 3
image
Physics, 22.06.2019 01:30, kaylin28
Astone is dropped with no initial velocity from the top of a cliff and hits the ground a time of 3.9 s later. what is the height of the cliff, in units of meters? you may assume that air resistance is negligible. give the answer as a positive number question 15 a figure skater is rotating at a rate of 200 revolutions per minute. what is the angular speed, in units of rad/s? 200 o 20.9 12000 o 3.33
Answers: 2
image
Physics, 22.06.2019 08:20, mimithurmond03
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
Do you know the correct answer?
By counting the number of crests that pass in a given amount of time, a person can calculate the...

Questions in other subjects: