Answers: 1
Physics, 22.06.2019 00:30, sophiaa23
Next a skier is pulled by a tow rope up a frictionless ski slope that makes an angle of 15 with the horizontal. the rope moves parallel to the slope with a constant speed of 0.69 m/s. the force of the rope does 800 3 of work on the skier as the skier moves a distance of 8.4 m up the incline. (a) if the rope moved with a constant speed of 2.2 m/s how much work would the force of the rope do on the skier as the skler moved a distance of 8.4 m up the incline? at what rate is the force of the rope doing work on the skier when the rope moves with a speed of (b) 0.69 m/s and (c) 2.2 m/s?
Answers: 1
Physics, 22.06.2019 12:50, shollydot1379
Assume you measured the mass of the cart to be (500 ± 1) g and the mass of the additional mass you put on the cart to be (500 ± 1) g as well. since the scale you are using in the lab cannot measure objects heavier than 600g you will have to sum up individual pieces and propagate the error. so what would be the mass and the standard error of the cart and the mass
Answers: 3
Physics, 22.06.2019 17:00, bella51032
Explain what will happen if decomposers were apsent from a forest ecoysystem.
Answers: 1
The earth’s magnetic field is located in the...
History, 04.06.2020 19:13
Mathematics, 04.06.2020 19:13
English, 04.06.2020 19:13
Mathematics, 04.06.2020 19:13
Biology, 04.06.2020 19:13
Mathematics, 04.06.2020 19:13