Physics
Physics, 02.04.2021 17:40, trinigal83

A cyclist intends to cycle up a 7.8° hill whose vertical height is 150 m. Assuming they start from rest and the mass of the bicycle plus the cyclist is 75 kg (a) Calculate how many kJ of work must be done?
(b) If the cyclist instead does 120 kJ of work, what will their velocity in m/s be at the top of the hill?

answer
Answers: 2

Other questions on the subject: Physics

image
Physics, 21.06.2019 17:30, emily9656
Awheel rotates without friction about a stationary horizontal axis at the center of the wheel. a constant tangential force equal to 82.0 n is applied to the rim of the wheel. the wheel has radius 0.150 m . starting from rest, the wheel has an angular speed of 12.8 rev/s after 3.88 s. what is the moment of inertia of the wheel?
Answers: 3
image
Physics, 21.06.2019 19:30, yomamaisfat1519
Abody of weight 60 kg is standing in a lift the lift going upward with a uniform velocity of 4.9 metre per second slows down and stops in two seconds then apparent weight of the body during the slow down process is
Answers: 2
image
Physics, 22.06.2019 17:00, nathanb126
The force it would take to accelerate an 900-kg car at the rate of 6m/s2
Answers: 1
image
Physics, 22.06.2019 17:00, StupidFatChipmunk
What equation is used to calculate the weight of an object on a plant ?
Answers: 1
Do you know the correct answer?
A cyclist intends to cycle up a 7.8° hill whose vertical height is 150 m. Assuming they start from r...

Questions in other subjects:

Konu
Biology, 23.06.2019 06:00
Konu
English, 23.06.2019 06:00