Physics
Physics, 18.02.2021 14:00, nxusasmangaliso1191

Explain budding (8marks)​

answer
Answers: 2

Other questions on the subject: Physics

image
Physics, 21.06.2019 16:30, nyce36
You throw a baseball directly upward at time t = 0 at an initial speed of 12.3 m/s. what is the maximum height the ball reaches above where it leaves your hand? at what times does the ball pass through half the maximum height? ignore air resistance and take g = 9.80 m/s2.
Answers: 1
image
Physics, 21.06.2019 22:20, ayoismeisalex
1400 kg car has a speed of 27 m/s. if it takes 7 s to stop the car, what is the impulse and the average force acting on the car?
Answers: 1
image
Physics, 22.06.2019 00:00, anna40794
(science)study the following ocean currents map. an ocean currents map is shown. on the map the locations for san diego, california and savannah, georgia are marked. there is a looping current from the north past san diego and a looping current from the south near savannah which statement is most likely correct about the average temperatures in san diego, california as compared to savannah, georgia? it is higher in savannah because of the cool ocean currents from the south. it is higher in savannah because of the warm ocean currents from the north. it is lower in san diego because of the warm ocean currents from the south. it is lower in san diego because of the cool ocean currents from the north.
Answers: 2
image
Physics, 22.06.2019 13:10, jaeana
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
Do you know the correct answer?
Explain budding (8marks)​...

Questions in other subjects: