Hey I need help can someone help me out, please
...
Answers: 2
Physics, 22.06.2019 13:10, jaeana
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
Physics, 22.06.2019 18:50, mariposa91
Avertical clean glass piezometer tube has an inside diameter of d = 1 mm and is used to measure pressure in a horizontal pipe carrying water as shown. due to pressure in the pipe, the water at 20c rises into the tube to a height h. if the water pressure in the pipe is p = 500 pa gauge, estimate the height h: (a) without considering surface tension (b) with surface tension (capillary) effects. the contact angle can be assumed at 30 deg
Answers: 2
History, 13.11.2021 15:00
Spanish, 13.11.2021 15:10
English, 13.11.2021 15:10
Mathematics, 13.11.2021 15:10
Social Studies, 13.11.2021 15:10
Spanish, 13.11.2021 15:10