Step
Calculate the change in time for each quarter of the track. The cl
Record the change in...
Answers: 2
Physics, 22.06.2019 01:30, romanlittlewood
For problems 1-3, consider a simple dc brush motor with a permanent magnet stator. with an an consider a simple dc brush motor with a permanent magnet ae supply voltage of 100 v, the no-load speed of the motor is 1000 rpm. this motor can provide a torque of 1.9 n-m at 800 rpm drawing a current of 2 a current are both zero at no load.) 1. with an armature supply voltage of 100 v, the motor is operated at 900 rpm. what is the motor torque? what is the mechanical power delivered by the motor? what is the current draw? what is the electrical power input? what is the energy efficiency of the motor? with an armature supply voltage of 100 v, the motor is operated at 1100 rpm (where it acts as a generator). what torque input is required? what mechanical power is required what current is generated? what is the electrical power generated? what is the energy efficiency of the motor acting as a generator? 2. with an armature supply voltage raised to 120 v, the motor is operated at 1000 rpm. what is the no-load speed? what is the motor torque? what is the mechanical power delivered by the motor? what is the current draw? what is the electrical power input what is the energy efficiency of the motor? 3.
Answers: 3
Physics, 22.06.2019 02:10, CrownedQueen
"an open tank has the shape of a right circular cone. the tank is 6 feet across the top and 5 feet high. how much work is done in emptying the tank by pumping the water over the top edge? note: the density of water is 62.4 lbs per cubic foot."
Answers: 2
Physics, 22.06.2019 14:40, akitchen10
A5 foot by 5 foot box culvert is buried 6 feet beneath the surface of the ground. a crosssection of this very long culvert (into and out of the page) is illustrated below. assume that the soil in which the culvert is buried has the following properties: jt = 120 pcf, w = 12%, ko = 0.50, ka = 0.33, and kp = 3.00. calculate the total horizontal force per unit length of culvert (fh) felt on one of the vertical faces of the culvert.
Answers: 1
Mathematics, 11.02.2021 06:10
Spanish, 11.02.2021 06:10
Mathematics, 11.02.2021 06:10
Mathematics, 11.02.2021 06:10
Mathematics, 11.02.2021 06:10
Arts, 11.02.2021 06:10