Assume that it takes an average of 3 man-hours to stack 1 ton of a particular item. In order to stack 36 tons in 6 hours, the number of people required is:. A) 9
B) 12
C) 15
D) 18
E) 21

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 02:30, richard80
Acar moves at 12m/s and coasts up a hill with a uniform acceleration of -1.6m/s2. how far has it traveled after 6.0s?
Answers: 1
image
Physics, 22.06.2019 04:30, johnkings140
The image shows the positions of a car on a roller coaster track. arrange the cars in order based on their gravitational potential energy. begin with the lowest potential energy and end with the highest.
Answers: 1
image
Physics, 22.06.2019 10:00, sofiaisabelaguozdpez
Two objects of different mass start from rest, are pulled by the same magnitude net force, and are moved through the same distance. the work done on object 1 is 900 j. after the force has pulled each object, object 1 moves twice as fast as object 2. how much work is done on object 2?
Answers: 1
image
Physics, 22.06.2019 10:10, randlemccray4305
What is the angular momentum of the bar about the axle?
Answers: 3
Do you know the correct answer?
Assume that it takes an average of 3 man-hours to stack 1 ton of a particular item. In order to stac...

Questions in other subjects:

Konu
Biology, 26.02.2020 05:23
Konu
Mathematics, 26.02.2020 05:23
Konu
Mathematics, 26.02.2020 05:23