Physics
Physics, 04.01.2021 23:50, kyleereeves2007

Vertical Motion Picture:
1. Luke is working on fixing a roof. He drops a pile of roof shingles from the
top of the roof located 4.50 m above the ground. Determine the time
required for the shingles to reach the ground. / Luke está trabajando en
arreglar un techo. Deja caer una pila de tejas desde la parte superior del
techo ubicado a 4.50 m sobre el suelo. Determina el tiempo necesario para
que las tejas lleguen al suelo.
Formula:
Given Variables:
V,=
V =
I
t =
a =
X =
Rearrange:
Unknown:
Substitute & Solve:


Vertical Motion

Picture:
1. Luke is working on fixing a roof. He drops a pile of roof shingles fr

answer
Answers: 2

Other questions on the subject: Physics

image
Physics, 21.06.2019 18:30, samieskyy290
Apassenger walks toward the rear of a moving train. describe her motion as seen from a reference point on the train. then describe it from a reference point on the ground
Answers: 2
image
Physics, 22.06.2019 00:00, pc103919
An inclined plane wrapped around a metal shaft is a a. lever b. screw c. pulley d. wedge
Answers: 2
image
Physics, 22.06.2019 04:00, Tirone
However, had it been a real sound, the sound's pitch would have been increased by the doppler effect, since the falcon was moving the source of the sound. perpendicular to away from towards at the same speed as
Answers: 1
image
Physics, 22.06.2019 04:30, Vanesssajohn6294
Which is not true about oxygen-17 and oxygen-18?
Answers: 1
Do you know the correct answer?
Vertical Motion Picture:
1. Luke is working on fixing a roof. He drops a pile of roof shingle...

Questions in other subjects:

Konu
Mathematics, 01.02.2021 21:00
Konu
Mathematics, 01.02.2021 21:00
Konu
English, 01.02.2021 21:00
Konu
Mathematics, 01.02.2021 21:00