An assembly line uses 4 workstations. The total task times in minutes are 15, 20, 15 and 10. What is the line efficiency if the cycle time is 20 minutes?

answer
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 03:40, AkramMasoud
Which types of electromagnetic waves have higher frequencies than the waves that make up ultraviolet light? check all that apply. radio waves infrared light microwaves gamma rays visible light x-rays
Answers: 2
image
Physics, 22.06.2019 04:00, katieleeisaacs8368
Ametal ball with a mass of 0.028 kg is dropped from rest at a height of 1.0 meters above the ground. assuming the energy in the ball is conserved, how much kinetic energy will the ball have when it is 0.5 meters above the ground?
Answers: 1
image
Physics, 22.06.2019 15:30, 573589
The radius of a sphere is increasing at a rate of 9 cm/ sec. find the radius of the sphere when the volume and the radius of the sphere are increasing at the same numerical rate.
Answers: 1
image
Physics, 22.06.2019 18:30, dbryrob2557
In which situation is the acceleration of a car negative? question 5 options: a)the velocity of a car was 75 km/hr over 4 hours. b)the velocity of a car reduced from 50 km/hr over one minute. c)the velocity of a car increased from 40 km. h to 75 km/h over 15 minutes. d)the velocity of a car was 45 km/hr at 2: 00pm and at 4: 00pm its velocity was 85 km/ht.
Answers: 2
Do you know the correct answer?
An assembly line uses 4 workstations. The total task times in minutes are 15, 20, 15 and 10. What is...

Questions in other subjects:

Konu
Mathematics, 24.11.2021 16:30