Physics
Physics, 18.11.2020 01:00, Rusven

What is t=0 s ond t = 8s? I'm doing a test and i struggle a lot with math sadly.

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 08:20, mimithurmond03
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
image
Physics, 22.06.2019 10:30, carsonjohnsonn
Argon, neon, and xenon are examples of
Answers: 1
image
Physics, 22.06.2019 15:30, anahitrejo1
1kg of water needs to recieve 4200j of energy to go from 90 degrees to 91 degrees. what is the specific heat capacity of water? what are the units?
Answers: 1
image
Physics, 22.06.2019 20:50, chocroc50
The second largest public utility in the nation is the sole provider of electricity in 32 counties of southern florida. to meet the monthly demand for electricity in these counties, which is given by the inverse demand function p = 1,200 – 4q, the utility company has set up two electric generating facilities: q1 kilowatts are produced at facility 1, and q2 kilowatts are produced at facility 2 (so q = q1 + q2). the costs of producing electricity at each facility are given by c1(q1) = 8,000 + 6q12 and c2(q2) = 6,000 + 3q22, respectively. determine the profit-maximizing amounts of electricity to produce at the two facilities, the optimal price, and the utility company’s profit
Answers: 3
Do you know the correct answer?
What is t=0 s ond t = 8s? I'm doing a test and i struggle a lot with math sadly....

Questions in other subjects:

Konu
Mathematics, 03.04.2020 22:51
Konu
Mathematics, 03.04.2020 22:52