Physics
Physics, 21.08.2020 14:01, ilovefood2064

Drehex Corporation needs to hire an engineer to develop W a prototype for a project. The company asks each
pro
engineer to provide a cost and time estimate for the work.
Each bid is shown in the table.

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 21.06.2019 22:00, jby
Atank holds 1000 gallons of water, which drains from the bottom of the tank in half an hour. the values in the table show the volume v of water remaining in the tank (in gallons) after t minutes. t(min) 5 10 15 20 25 30v(gal) 694 444 250 111 28 0(a) if p is the point (15, 250) on the graph of v, find the slopes of the secant lines pq when q is the point on the graph with t = 5, 10, 20, 25, and 30.(b) estimate the slope of the tangent line at p by averaging the slopes of two secant lines.(c) use a graph of the function to estimate the slope of the tangent line at p. (this slope represents the rate at which the water is flowing from the tank after 15 minutes.)show all steps.
Answers: 2
image
Physics, 22.06.2019 02:30, richard80
Acar moves at 12m/s and coasts up a hill with a uniform acceleration of -1.6m/s2. how far has it traveled after 6.0s?
Answers: 1
image
Physics, 22.06.2019 08:20, mimithurmond03
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
image
Physics, 22.06.2019 10:00, kanonhuffmanp3rnmy
The frequencies refer to the sample data collected from a population of interest when performing a hypothesis test comparing two or more population proportions.
Answers: 2
Do you know the correct answer?
Drehex Corporation needs to hire an engineer to develop W a prototype for a project. The company as...

Questions in other subjects:

Konu
Spanish, 25.02.2021 23:30
Konu
Physics, 25.02.2021 23:30