Physics
Physics, 19.08.2020 05:01, bellam302

Part A.)Six boxes held at rest against identical walls. Rank the boxes on the basis of the magnitude of the normal force acting on them.
Rank from largest to smallest. To rank items as equivalent, overlap them.
1) 130N--->7kg
2) 150N--->1kg
3) 150N--->7kg
4) 120N--->3kg
5) 140N--->5kg
6) 140N--->3kg
(Since the boxes are at rest, Newton's 2nd law dictates that the horizontal forces on each box must add up to zero. You can use this information to determine the normal forces. If two boxes are both pushed against the wall by the same force, then they should experience the same normal force.)
Part B.) Rank the boxes on the basis of the frictional force acting on them.
Rank from largest to smallest. To rank items as equivalent, overlap them.
1) 130N--->7kg
2) 150N--->1kg
3) 150N--->7kg
4) 120N--->3kg
5) 140N--->5kg
6) 140N--->3kg

answer
Answers: 3

Other questions on the subject: Physics

image
Physics, 22.06.2019 02:10, allytrujillo20oy0dib
How is coal extracted from mountaintop removal mines? a. dynamite is used to create underground tunnels where miners go to extract the coal. b. dynamite is used to break apart rocks and then draglines are used to remove the broken rock and reach the coal. c. coal in mountaintops is extracted by digging strips in the landscape to reach the coal. d. placer deposits in mountain river bottoms are removed by
Answers: 2
image
Physics, 22.06.2019 04:00, alexialoredo625
When the force acting on an object points at least partially in the direction of the motion the work done is considered to be negative
Answers: 2
image
Physics, 22.06.2019 07:00, nandinipp0303
Ineed the answers for these promblems i have
Answers: 3
image
Physics, 22.06.2019 13:10, jaeana
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
Do you know the correct answer?
Part A.)Six boxes held at rest against identical walls. Rank the boxes on the basis of the magnitud...

Questions in other subjects:

Konu
Mathematics, 03.01.2020 11:31
Konu
Geography, 03.01.2020 11:31