Physics
Physics, 17.08.2020 01:01, joe6076

Water enters a student's house 10.0 m above the ground through a pipe with a cross section area of 1.00 x 10-4m2 at ground. Inside the house the pipe's cross section area is 0.50 x 10-4m2. The student in the house want to know the water pressure inside the pipe at the ground level. He first measured the volume of the bath tank that equals to 45.0 L. Then he fill the tank (the tank is 10 meters above the ground) inside the house with 90.0 seconds. The pipe inside the house is open with the sea level pressure The density of water is 1000 kgm3. (a) Calculate the water speed at the ground pipe with larger cross section area and the water speed inside the house with smaller cross section area.
(b) Calculate the water pressure in the pipeline at the ground level.

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 02:30, itzyougirllona47
Herbivores, carnivores, and omnivores are all types a. decomposers b. producers c. consumers d. biomes
Answers: 2
image
Physics, 22.06.2019 10:00, lorelei7668
(a) calculate the number of electrons in a small, electrically neutral silver pin that has a mass of 10.0 g. silver has 47 electrons per atom, and its molar mass is 107.87 g/mol. (b) imagine adding electrons to the pin until the negative charge has the very large value 1.00 mc. how many electrons are added for every 109 electrons already present
Answers: 3
image
Physics, 22.06.2019 15:30, jjjjjj4999
Match each scenario to the form of energy it represents
Answers: 2
image
Physics, 22.06.2019 17:00, miya214
The chart shows the costs and shipping times for materials that a company needs to build a new product. which describes the best trade-off if the company needs to start building their product within the next two years? they should order the domestic materials because it is always best to choose the fastest shipping time. they should order the imported materials because it is always best to choose the lowest cost for materials. since the shipping time is longer, they should order the domestic materials because the additional cost is worth it to get the materials in time. even though the shipping time is longer, they should order the imported materials because they are less expensive and should arrive in plenty of time to build the product.
Answers: 1
Do you know the correct answer?
Water enters a student's house 10.0 m above the ground through a pipe with a cross section area of 1...

Questions in other subjects:

Konu
Biology, 23.09.2019 04:30