Physics
Physics, 05.05.2020 11:33, mariposa91

A power station delivers 750 kW of power at 12,000 Vto a factory through wires with total resistance 3.0 O. How much less power is wasted if the electricity is delivered at50,000 V rather than 12,000 V?

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 06:00, vittoriochavez9700
An object moves from position +34m to the position -15m in 15 seconds. what is the total displacement? what is the total velocity?
Answers: 3
image
Physics, 22.06.2019 15:30, tiffuuu
At 20∘c, the hole in an aluminum ring is 2.800 cm in diameter. you need to slip this ring over a steel shaft that has a room-temperature diameter of 2.804 cm . 1. to what common temperature should the ring and the shaft be heated so that the ring will just fit onto the shaft? coefficients of linear thermal expansion of steel and aluminum are 12×10−6 k−1 and23×10−6 k−1 respectively.
Answers: 1
image
Physics, 22.06.2019 15:30, haileyjones732
Two pans of a balance are 24.1 cm apart. the fulcrum of the balance has been shifted 1.33 cm away from the center by a dishonest shopkeeper. by what percentage is the true weight of the goods being marked up by the shopkeeper? assume the balance has negligible mass. answer in units of %.
Answers: 1
image
Physics, 22.06.2019 17:00, miya214
The chart shows the costs and shipping times for materials that a company needs to build a new product. which describes the best trade-off if the company needs to start building their product within the next two years? they should order the domestic materials because it is always best to choose the fastest shipping time. they should order the imported materials because it is always best to choose the lowest cost for materials. since the shipping time is longer, they should order the domestic materials because the additional cost is worth it to get the materials in time. even though the shipping time is longer, they should order the imported materials because they are less expensive and should arrive in plenty of time to build the product.
Answers: 1
Do you know the correct answer?
A power station delivers 750 kW of power at 12,000 Vto a factory through wires with total resistance...

Questions in other subjects:

Konu
Physics, 04.12.2021 01:00
Konu
English, 04.12.2021 01:00
Konu
Mathematics, 04.12.2021 01:00