For some program, compiler A produces a program with a dynamic instruction count of 109 instructions and execution time of 1.1 seconds, while compiler B produces a program with a dynamic instruction count 1.2*109 and execution time of 1.5 seconds. Find an average CPI for each program given that the processor has a clock cycle time of 10-9 seconds. You must show the computations that lead to the answer.
Answers: 2
Physics, 22.06.2019 10:30, gyexisromero10
Air is to be preheated by hot exhaust gases in a cross-flow heat exchanger before it enters the furnace. air enters the heat exchanger at 95 kpa and 20°c at a rate of 0.6 m^3/s. the combustion gases (cp = 1.10 kj/kg°c) enter at 160°c at a rate of 0.95 kg/s and leave at 95°c. determine the rate of heat transfer to the air and its outlet temperature.
Answers: 2
Physics, 22.06.2019 12:00, ameliaxbowen7
Suppose a comet has an orbital period of 309.1 years around the sun. what is it’s average distance from the sun?
Answers: 1
Physics, 22.06.2019 13:20, monkeygaming274
Ahanging spring stretches by 35.0 cm when an object of mass 450 g is hung on it at rest. in this situation, we define its position as x = 0. the object is pulled down an additional 18.0 cm and released from rest to oscillate without friction. what is its position x at a moment 84.4 s later? express your answer in cm.
Answers: 1
For some program, compiler A produces a program with a dynamic instruction count of 109 instructions...
Mathematics, 11.12.2020 01:00
History, 11.12.2020 01:00
Mathematics, 11.12.2020 01:00
Law, 11.12.2020 01:00
Mathematics, 11.12.2020 01:00