Physics
Physics, 03.04.2020 00:16, oseniiyabode123

Se observa la posición de un objeto en diferentes instantes y se obtiene los siguientes datos:
T(seg) 1,2,3,4,5,7,8,9,10,11,12,13
D(m)0,6,12,18,24,21,18,27,36,45,45, 45
A)realizar la gráfica distancia. tiempo
B) calcular la pendiente de cada una de las rectas
C) distancia recorrida entre 6seg y8seg
D) distancia total recorrida
E) realiza la gráfica velocidad. Tiempo

answer
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 10:40, corrineikerd
When the magnetic domains in a material can be aligned, but eventually drift out of alignment, the material is
Answers: 2
image
Physics, 22.06.2019 11:00, stankyweezle
A0.580-kg rock is tied to the end of a string and is swung in a circle with a radius of 0.500 meters. the velocity of the rock is 4.50 m/s. what is the centripetal force acting on the rock? 15.5 n 5.22 n 69.8 n 23.5 n
Answers: 3
image
Physics, 22.06.2019 17:40, sosaucyy
Emmy kicks a soccer ball up at an angle of 45° over a level field. she watches the ball's trajectory and notices that it lands, two seconds after being kicked, about 20 m away to the north. assume that air resistance is negligible, and plot the horizontal and vertical components of the ball's velocity as a function of time. consider only the time that the ball is in the air, after being kicked but before landing. take "north" and "up" as the positive ‑ and ‑directions, respectively, and use ≈10 m/s2 for the downward acceleration due to gravity.
Answers: 2
image
Physics, 22.06.2019 19:50, nadiareese
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j
Answers: 3
Do you know the correct answer?
Se observa la posición de un objeto en diferentes instantes y se obtiene los siguientes datos:
...

Questions in other subjects: