A heavy rope, 60 ft long, weighs 0.5 lb/ft and hangs over the edge of a building 130 ft high. (Let x be the distance in feet below the top of the building. Enter xi* as xi.)
a) How much work W is done in pulling the rope to the top of the building?
Show how to approximate the required work by a Riemann sum.
Express the work as an integral.
Evaluate the intergral
(b) How much work W is done in pulling half the rope to the top of the building?
-Show how to approximate the required work by a Riemann sum.
-Express the work as an integral.
-Evaluate the intergral
Answers: 3
Physics, 22.06.2019 03:30, ashah1260
Starting with only the balmer series light (visible light), how could we ensure that the solar panels generate a current that mark can use for his power station? a)by gradually increasing the brightness (amount) of light that we shine on it. b)by gradually increasing the frequency of the light we shine on it. c)by gradually increasing the wavelength of the light that we shine on it.
Answers: 3
Physics, 22.06.2019 10:30, dontcareanyonemo
Avery long solenoid of inner radius 2.75 cm creates an oscillating magnetic field of the form = for this solenoid, =0.00425 t and =319 rad/s. (a)what is the maximum value of the induced electric field at a perpendicular distance 1.45 cm from the axis of the solenoid? (b) what is the maximum value of the inducted electric field at a point 5.85 cm perpendicular from the axis of the solenoid?
Answers: 1
Physics, 22.06.2019 11:30, lifeofabe214
Why is the energy that results from a roller coaster's position at the top of a hill referred to as potential energy?
Answers: 1
A heavy rope, 60 ft long, weighs 0.5 lb/ft and hangs over the edge of a building 130 ft high. (Let x...
Mathematics, 02.08.2019 06:00
Mathematics, 02.08.2019 06:00
History, 02.08.2019 06:00
History, 02.08.2019 06:00
History, 02.08.2019 06:00
History, 02.08.2019 06:00
History, 02.08.2019 06:00