Physics
Physics, 10.03.2020 04:44, TrueKing184

A battery high rate discharge (load capacity) test is being performed on a 12 volt battery. Technician A says that a good battery should have a voltage reading of higher than 9.6 volts while under load at the end of the 15-second test. Technician B says that the battery should be discharged (loaded) to twice its CCA rating. Which technician is correct?

answer
Answers: 3

Other questions on the subject: Physics

image
Physics, 21.06.2019 19:30, krudmagreaner
Aparticle travels in a circular orbit of radius 21 m. its speed is changing at a rate of 23.1 m/s2 at an instant when its speed is 37.2 m/s. what is the magnitude of the acceleration (in m/s? ) of the particle?
Answers: 1
image
Physics, 22.06.2019 09:00, lexis1446
Infrared rays have a shorter wavelength than question 11 options: x-rays. ultraviolet rays. radio waves. gamma rays.
Answers: 1
image
Physics, 22.06.2019 23:40, itzdulce
To place a communications satellite into a geosynchronous orbit at an altitude of 22,240 mi above the surface of the earth, the satellite first is released from a space shuttle , which is in a circular orbit at an altitude of 185 mi, and then is propelled by an upper-stage booster to its final altitude. as the satellite passes through a, the booster's motor is fired to insert the satellite into an elliptic transfer orbit. the booster is again fired at b to insert the satellite into a geosynchronous orbit. knowing that the second firing increases the speed of the satellite by 4810ft/s, determine (a.) the speed of the satellite as it approaches b on the elliptic transfer orbit, (b.) the increase in speed resulting from the first firing at a.
Answers: 2
image
Physics, 23.06.2019 09:00, WintryTurtle
In the cores of extremely hot red giants, nuclear reactions convert helium to
Answers: 1
Do you know the correct answer?
A battery high rate discharge (load capacity) test is being performed on a 12 volt battery. Technici...

Questions in other subjects:

Konu
Social Studies, 07.12.2021 05:00