A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to assemble the product is 29.5 min. Production rate of the line is 40 units/hr. The proportion uptime is 96% and the repositioning time is 9 sec. Determine the balance delay on the line

answer
Answers: 2

Other questions on the subject: Physics

image
Physics, 21.06.2019 19:30, Esmer1030
Agymnast dismounts off the uneven bars in a tuck position with a radius of 0.3m (assume she is a solid sphere) and an angular velocity of 2rev/s. during the dismount she stretches out into the straight position, with a length of 1.5m, (assume she is a uniform rod through the center) for her landing. the gymnast has a mass of 50kg. what is her angular velocity in the straight position?
Answers: 3
image
Physics, 22.06.2019 12:30, clmorcutt420
Apositive charge moves in the direction of an electric field. which of the following statements are true? check all that apply. check all that apply. 1.the potential energy associated with the charge decreases. 2. the electric field does positive work on the charge. 3. the electric field does negative work on the charge. 4. the potential energy associated with the charge increases. 5. the electric field does not do any work on the charge. 6. the amount of work done on the charge cannot be determined without additional information.
Answers: 1
image
Physics, 22.06.2019 15:00, depinedainstcom
What property of an object determines its inertia?
Answers: 2
image
Physics, 22.06.2019 21:00, liddopiink1
Earth's atmosphere is composed of mostly two gases. name the two gases that make up the majority of the atmosphere and use the pie chart to tell the percentages of each.
Answers: 2
Do you know the correct answer?
A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to as...

Questions in other subjects:

Konu
Mathematics, 05.02.2021 20:20
Konu
Mathematics, 05.02.2021 20:20