Physics
Physics, 21.02.2020 22:02, isa6476

It takes 3.0 μJ of work to move a 17 nC charge from point A to B. It takes -6.5 μJ of work to move the charge from C to B. Part A What is the potential difference VC−VA? Express your answer using two significant figures.

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 05:30, ninaaforever
Aforklift raises a 1,020 n crate 3.50 m up to a shelf. how much work is done by the forklift on the crate? the forklift does j of work on the crate.
Answers: 2
image
Physics, 22.06.2019 11:00, taylorwhitfield6
Aperson walks first at a constant speed of 4.89 m/s along a straight line from point a to point b and then back along the line from b to a at a constant speed of 2.95 m/s. what is the average speed over the entire trip?
Answers: 1
image
Physics, 22.06.2019 12:20, cxttiemsp021
Which lists the pairs of plates in order from least to greatest in terms of the work done to move the electron?
Answers: 2
image
Physics, 22.06.2019 13:00, help1572
Aplayground merry-go-round has a radius of 4.6 m and a moment of inertia of 200 kg-m2 and turns with negligible friction about a vertical axle through its center. a child applies a 26.0 n force tangentially to the edge of the merry-go-round for 15.0 seconds. if the merry-go-round is initially at rest, how much work did the child do on the merry-go-round?
Answers: 1
Do you know the correct answer?
It takes 3.0 μJ of work to move a 17 nC charge from point A to B. It takes -6.5 μJ of work to move t...

Questions in other subjects:

Konu
History, 01.04.2020 19:24