Physics
Physics, 18.02.2020 23:28, KingD3474

If A, B, and C are three activities connected with SS and FF (combination) relationships with 2-day lag on SS relationship only. Their durations are 5, 10, and 3 respectively. What is the duration of the project?a. 5 days. b. 10 days. c. 3 days. d 18 days.

answer
Answers: 3

Other questions on the subject: Physics

image
Physics, 22.06.2019 09:00, keshho
When a bicycle coasts uphill, it moves slower and slower as it climbs. why? a. its kinetic energy is transforming into heat energy. b. its potential energy is transforming into kinetic energy. c. its kinetic energy is transforming into potential energy and heat energy. d. its potential energy is transforming into kinetic energy and heat energy.
Answers: 1
image
Physics, 22.06.2019 12:10, anaroles04
Light traveling in water, nwater = 1.33, strikes a plastic block at an angle of incidence of 51.4°; part of the beam is reflected and part is refracted. if the index of refraction of the plastic is 2.0, what is the angle made by the reflected and refracted beams?
Answers: 2
image
Physics, 22.06.2019 17:00, nathanb126
The force it would take to accelerate an 900-kg car at the rate of 6m/s2
Answers: 1
image
Physics, 22.06.2019 21:10, bri9263
Two masses are connected by a rope that hangs over a pulley as shown below. the pulley is a uniform cylinder of radius 푅=0.381meters and mass 푀=3.1푘푔. initially 푚"is on the ground and 푚#rests 2.5 meters above the ground. if the system is released, use conservation of energy to determine the speed of 푚#just before it strikes the ground. assume the pulley bearing is frictionless.
Answers: 2
Do you know the correct answer?
If A, B, and C are three activities connected with SS and FF (combination) relationships with 2-day...

Questions in other subjects: