Physics
Physics, 14.02.2020 03:27, diamondscott9297

An approach to a pretimed signal has 30 seconds of effective red, and D/D/1 queuing holds. The total delay at the approach is 83.33 veh-s/cycle and the saturation flow rate is 1000 veh/h. If the capacity of the approach equals the number of arrivals per cycle, determine the approach flow rate and cycle length.

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 21.06.2019 18:20, charlie3051
Find the vertex(use the completing the square method), findthe x- and y-intercepts, and sketch the graph offunction. y = 2x2 + 4x - 1
Answers: 3
image
Physics, 22.06.2019 03:00, mmcdaniels46867
Isla’s change in velocity is 30 m/s, and hazel has the same change in velocity. which best explains why they would have different accelerations? isla had negative acceleration, and hazel had positive. isla had a different time than hazel. isla had positive acceleration, and hazel had negative. isla went a farther distance than hazel.
Answers: 1
image
Physics, 22.06.2019 07:20, raemyiajackson1
Use the information presented in the graph to answer the questions. which segments show acceleration? which segment indicates that the object is slowing down? what is the velocity of segment b? what is the acceleration of segment b?
Answers: 3
image
Physics, 22.06.2019 11:30, chelsilconway2262
This punnett square shows the cross between two pants. one parent has round seeds (rr). and the other parent has wrinkled seeds (rr) which best describes their offspring as shown in this cross?
Answers: 2
Do you know the correct answer?
An approach to a pretimed signal has 30 seconds of effective red, and D/D/1 queuing holds. The total...

Questions in other subjects:

Konu
Spanish, 13.07.2021 21:00
Konu
Mathematics, 13.07.2021 21:00
Konu
Mathematics, 13.07.2021 21:00
Konu
Mathematics, 13.07.2021 21:00