Physics
Physics, 21.11.2019 00:31, vivian2020

What type of relationship is shown in the graph?
time vs. position of battery operated car
o
a non-linear, negative relationship
a linear, negative relationship
a linear, positive relationship
a non-linear, positive relationship
position (m)
>
e and exit
next
mark this and retum
submit
o precious acum
javascript: void(0);
.

answer
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 05:50, lola5683
Sawyer is studying diffraction. he draws a diagram of a plane wave to show how light waves travel. which best describes sawyer’s error? the wave fronts should be perpendicular to the direction in which the waves move. the arrow showing the direction of movement of the waves should be pointing to the left. the arrow showing the direction of movement of the waves should be pointing downward. the wave fronts should be both parallel and perpendicular to the direction in which the waves move.
Answers: 2
image
Physics, 22.06.2019 12:10, malikbryant2002
Consider a one meter long horizontal pipe with a constant 100 cm^2 cross sectional area. water flows rightward into the pipe at x = 0 with flow velocity 02m/sec at every point within the pipe intake area. at x=1, the rightward flow rate is 0.192 m/sec. assume the water is a conserved quantity in the pipe, so there must be a leak (a sink) somewhere in the pipe. 1. compute net volumetric flow of the source if the system to be in equilibrium. 2. now assume the pipe in the problem has no leaks. compute the net volumetric rate of change for the system.
Answers: 3
image
Physics, 22.06.2019 12:30, promcafee8788
Awheel of mass 48 kg is lifted to a height of 0.8 m. how much gravitational potential energy is added to the wheel? acceleration due to gravity is g = 9.8 m/s2. a. 30.4 j b. 3.1 j c. 297.9 j d. 11,321 j
Answers: 1
image
Physics, 22.06.2019 23:20, libbybacon7
Consider a production line with five stations. station 1 can produce a unit in 9 minutes. station 2 can produce a unit in 10 minutes. station 3 has two identical machines, each of which can process a unit in 12 minutes (each unit only needs to be processed on one of the two machines. station 4 can produce a unit in 5 minutes. station 5 can produce a unit in 8 minutes. which station is the bottleneck station?
Answers: 2
Do you know the correct answer?
What type of relationship is shown in the graph?
time vs. position of battery operated car

Questions in other subjects:

Konu
Mathematics, 06.07.2019 23:50
Konu
Mathematics, 06.07.2019 23:50