Physics
Physics, 10.09.2019 17:30, imstupid77

Abatch of parts is produced on a semi-automated production machine in a sequential batch production operation. batch quantity is 300 units. setup takes 55 min. a worker loads and unloads the machine each cycle, which takes 0.75 min. machine processing time is 3.46 min/cycle, and tool handling time is negligible. one part is produced each cycle. determine (a) average cycle time, (b) time to complete the batch, and (c) average production rate.

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 01:00, MoparorNocar061401
Complete the sentence to describe the law of conservation of energy. the law of conservation of energy states that energy cannot be created or , but it can be
Answers: 1
image
Physics, 22.06.2019 05:30, ellycleland16
Iwill give 30 points to whoever answers ! what is the formula for actual mechanical advantage and ideal mechanical advantage?
Answers: 1
image
Physics, 22.06.2019 14:40, kellypechacekoyc1b3
Asolid cylinder and a cylindrical shell have the same mass, same radius, and turn on frictionless, horizontal axles. the cylindrical shell has light-weight spokes connecting the shell to the axle. a rope is wrapped around each cylinder and tied to blocks of equal masses that are held the same height above the ground. both blocks are released simultaneously. the ropes do not slip. which block hits the ground first? or is it a tie?
Answers: 3
image
Physics, 22.06.2019 19:30, isiahb123
A47.2 g block of copper whose temperature is 480 k is placed in an insulating box with a 91.8 g block of lead whose temperature is 200 k. (a) what is the equilibrium temperature of the two-block system? (b) what is the change in the internal energy of the two-block system between the initial state and the equilibrium state? (c) what is the change in the entropy of the two-block system? the heat capacities of copper and lead are 386 j/kg·k and 128 j/kg·k, respectively.
Answers: 1
Do you know the correct answer?
Abatch of parts is produced on a semi-automated production machine in a sequential batch production...

Questions in other subjects:

Konu
Mathematics, 29.11.2019 09:31
Konu
Mathematics, 29.11.2019 09:31