Physics
Physics, 12.07.2019 17:10, musicaljay8320

Alead mine has an ore deposit estimated at 3.02 × 106 metric tons (tonnes). assays of the deposit indicate it has a galena content of 6 percent by mass. how many tonnes of lead can potentially be obtained from the deposit? (assume full recovery.) the mass of lead that can potentially be obtained from the deposit is: × 10 tonnes.

answer
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 04:10, kimbllumi
An initially unpolarized light if intensity 500 w/m^2 passes through four polarizers. the transmission axis between adjacent polarizers is 45∘. what percentage of the initial intensity is transmitted by the system?
Answers: 2
image
Physics, 22.06.2019 05:50, lola5683
Sawyer is studying diffraction. he draws a diagram of a plane wave to show how light waves travel. which best describes sawyer’s error? the wave fronts should be perpendicular to the direction in which the waves move. the arrow showing the direction of movement of the waves should be pointing to the left. the arrow showing the direction of movement of the waves should be pointing downward. the wave fronts should be both parallel and perpendicular to the direction in which the waves move.
Answers: 2
image
Physics, 22.06.2019 18:00, cratsley321
By what primary heat transfer mechanism does the sun warm the earth?
Answers: 1
image
Physics, 22.06.2019 21:00, dondre54
Describe how the motion of a spring being pushed forward and backward is similar to the motion of air particles in a sound wave.
Answers: 1
Do you know the correct answer?
Alead mine has an ore deposit estimated at 3.02 × 106 metric tons (tonnes). assays of the deposit in...

Questions in other subjects:

Konu
Engineering, 13.01.2021 16:30
Konu
Social Studies, 13.01.2021 16:30