Physics
Physics, 02.10.2019 14:50, PSBSolarYT

You do a certain amount of work on an object initially at rest, and all the work goes into increasing the object’s speed. if you do work w, suppose the object’s final speed is v. what will be the object’s final speed if you do twice as much work? 1. 2 v 2. v/√ 2 3. √ 2 v 4. still v 5. 4 v

answer
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 02:20, shadoris26
According to newton’s first law of motion, which force is expected to cause a body to accelerate?
Answers: 1
image
Physics, 22.06.2019 11:30, ghernadez
This punnett square shows the cross between two pants. one parent has round seeds (rr). and the other parent has wrinkled seeds (rr) which best describes their offspring as shown in this cross?
Answers: 1
image
Physics, 22.06.2019 19:10, simmonss1185
3. a worker pushes a 30.5 kg polished stone along a polished table with a force on bonin a straight line for 5.20 s after starting from rest. there is no friction between thestone and the table. at the end of the table. the stone is hooked to a cable with a lengthof 62.0 cm to rotate it to a rough table to store until they can be picked up. the roughtable has a coefficient of static friction 0.702 with the polished stone. remember that 8= 9.80 m/s2a) what is the speed of the stone when it is hooked to the cable? b) what is the tension in the cable while the stone is rotating? (there is still nofriction)c) how much force is needed to make the stone begin sliding from rest on therough table? ius = 0.70262.0 cm30.5 kg20.5 kg6= 0
Answers: 2
image
Physics, 22.06.2019 23:00, katelynn73
Amother used 150 watts of power to raise a 15 newton object in a time interval of 8.0 seconds. through what vertical distance was the object raised ?
Answers: 1
Do you know the correct answer?
You do a certain amount of work on an object initially at rest, and all the work goes into increasin...

Questions in other subjects: