Mathematics
Mathematics, 21.07.2019 16:00, litwork5885

Aconstruction company needs to remove 2 1/6 tons of dirt from a construction site. they can remove 7/8 tons of dirt each hour. what is the total number of hours it will take to remove the dirt?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:20, kelli151
Which of these equations, when solved, gives a different value of x than the other three? a9.1 = -0.2x + 10 b10 = 9.1 + 0.2x c10 – 0.2x = 9.1 d9.1 – 10 = 0.2x
Answers: 1
image
Mathematics, 21.06.2019 18:00, madiballet125
What are the equivalent ratios for 24/2= /3= /5.5=108/ = /15
Answers: 1
image
Mathematics, 21.06.2019 21:30, muncyemily
Which of the following shows the length of the third side, in inches, of the triangle below
Answers: 2
image
Mathematics, 21.06.2019 23:20, puremousetail
6cm10 cma conical paper cup has dimensions as shown in the diagram. how much water can the cup hold when full?
Answers: 1
Do you know the correct answer?
Aconstruction company needs to remove 2 1/6 tons of dirt from a construction site. they can remove 7...

Questions in other subjects:

Konu
Mathematics, 20.10.2020 04:01
Konu
Mathematics, 20.10.2020 04:01