Mathematics
Mathematics, 26.07.2019 04:30, jonestheproblem5029

8men complete a work in 40 days. how many days will be taken to complete the samed work if 2 more men join them.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:00, BreadOfTheBear
Glenda makes an online purchase for picture frames for $12.95 each and formats of $5.89 each the site says it taxes paid by the customer or 6.5% of the total purchase price shipping charges are based on the
Answers: 1
image
Mathematics, 21.06.2019 22:50, Yangster9305
Ur environment is very sensitive to the amount of ozone in the upper atmosphere. the level of ozone normally found is 4.04.0 parts/million (ppm). a researcher believes that the current ozone level is not at a normal level. the mean of 2525 samples is 4.44.4 ppm with a standard deviation of 0.80.8. assume the population is normally distributed. a level of significance of 0.020.02 will be used. make the decision to reject or fail to reject the null hypothesis. answer tables
Answers: 3
image
Mathematics, 21.06.2019 23:50, dbag1162
The federal reserve controls certain interest rates in the united states. investors often try to speculate as to whether the federal reserve will raise or lower rates and by how much. suppose a company conducts extensive interviews with financial analysts, and as a result, predicts that "thefed" will increase rates by an average of 0.25 percentage points every six months for the forseeable future. which type of equation could be used to model the predicted interest rates over the next several years, assuming no other significant changes? a) a linear equation b) a quadratic equation c) a polynomial equation d) an exponential equation
Answers: 3
image
Mathematics, 22.06.2019 02:30, lieunekop8fm90
The center on a target has a diameter of 5 inches. the whole target has a diameter of 25 inches. complete the explanation for what part of the whole target is the center. the center of the target takes up % of the whole target.
Answers: 3
Do you know the correct answer?
8men complete a work in 40 days. how many days will be taken to complete the samed work if 2 more me...

Questions in other subjects:

Konu
Mathematics, 23.04.2020 18:01