Mathematics
Mathematics, 28.07.2019 21:00, cece9080

Working together shawn and hector can instal a tile floor in 6 hours. it would take shawn 9 hours to do the job alone. what is the value of r, the part of the tile that hector could install in 1 hour? a. 1/18 b. 1/9 c. 1/3 d. 2/3

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:00, gujacksongu6
M. xyz =radians. covert this radian measure to its equivalent measure in degrees.
Answers: 1
image
Mathematics, 22.06.2019 01:30, monica1400
Write the equation of the circle centered at (10,-2) with radius 2.
Answers: 2
image
Mathematics, 22.06.2019 01:30, monae2116
There are 10 chicks on ginger's farm .she has 2 chicks in one outdoor pen and 5 chicks in another. the rest of the chicks are in the barn. what is the fraction of total chicks in outdoor pens?
Answers: 1
image
Mathematics, 22.06.2019 02:00, mixedgirlmara
Find the slope intercept form of (-3,6) and (3,-6)
Answers: 1
Do you know the correct answer?
Working together shawn and hector can instal a tile floor in 6 hours. it would take shawn 9 hours to...

Questions in other subjects: