Mathematics
Mathematics, 22.08.2019 08:30, madisontrosclair2

If 10 men can complete a piece of work in 30 days how many men are requiredto complete the same job in 25 days?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:00, codyshs160
The boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a) e = 2b - 212 b) b = 2e - 212 c) e = -2b + 212 d) b = -2e + 212
Answers: 1
image
Mathematics, 22.06.2019 01:50, sierram298
One cell phone plan charges $20 per month plus $0.15 per minute used. a second cell phone plan charges $35 per month plus $0.10 per minute used. write and solve an equation to find the number of minutes you must talk to have the same cost for both calling plans.
Answers: 2
image
Mathematics, 22.06.2019 02:00, mixedgirlmara
Find the slope intercept form of (-3,6) and (3,-6)
Answers: 1
image
Mathematics, 22.06.2019 02:00, louie3096
Would greatly appreciate these 3 answers
Answers: 3
Do you know the correct answer?
If 10 men can complete a piece of work in 30 days how many men are requiredto complete the same job...

Questions in other subjects:

Konu
Mathematics, 11.01.2021 21:20
Konu
Mathematics, 11.01.2021 21:20
Konu
Mathematics, 11.01.2021 21:30
Konu
History, 11.01.2021 21:30