Mathematics, 03.08.2019 12:00, santos200154
Atoy manufacturer wants to minimize her cost for producing two lines of toy airplanes. because of the supply of materials, no more than 40 flying bats can be built each day, and no more than 60 flying falcons can be built each day. there are enough workers to build at least 70 toy airplanes each day. it costs $12 to manufacture a flying bat and $8 to build a flying falcon. what is the minimum possible cost each day?
Answers: 1
Mathematics, 21.06.2019 15:30, mag331
Afruit stand has to decide what to charge for their produce. they need $10 for 4 apples and 4 oranges. they also need $15 for 6 apples and 6 oranges. we put this information into a system of linear equations. can we find a unique price for an apple and an orange?
Answers: 2
Mathematics, 22.06.2019 01:30, paulethjara
When solving a logarithm equation, how do you find the missing variable ?
Answers: 2
Atoy manufacturer wants to minimize her cost for producing two lines of toy airplanes. because of th...
Biology, 25.09.2020 14:01
Physics, 25.09.2020 14:01
English, 25.09.2020 14:01
Mathematics, 25.09.2020 14:01
English, 25.09.2020 14:01
Mathematics, 25.09.2020 14:01