Mathematics
Mathematics, 31.07.2019 07:00, MissSusan183

The donaldson furniture company produces three types of rocking chairs: the children's model, the standard model, and the executive model. each chair is made in three stages: cutting, construction, and finishing. stage children's standard executive cutting 5 hr 4 hr 7 hr construction 3 hr 2 hr 5 hr finishing 2 hr 2 hr 4 hr the time needed for each stage of each chair is given in the chart. during a specific week the company has available a maximum of 152152 hours for cutting, 9292 hours for construction, and 7474 hours for finishing. determine how many of each type of chair the company should make to be operating at full capacity.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, Rperez6491
The number of revolutions of two pulleys is inversely proportional to their diameters. if a 24-inch diameter pulley making 400 revolutions per minute is belted to an 8-inch diameter pulley, find the number of revolutions per minute of the smaller pulley.
Answers: 1
image
Mathematics, 21.06.2019 17:50, amcdonald009
To solve the system of equations below, grace isolated the variable y in the first equation and then substituted into the second equation. what was the resulting equation? 3y=12x x^2/4+y^2/9=1
Answers: 1
image
Mathematics, 21.06.2019 19:40, giiffnlojd
Which is greater, 7 p 5 or 7 c 5? 7p5 7c5
Answers: 1
image
Mathematics, 21.06.2019 21:00, JamlessJimin
The radius of a sphere is 3 inches. which represents the volume of the sphere?
Answers: 1
Do you know the correct answer?
The donaldson furniture company produces three types of rocking chairs: the children's model, the s...

Questions in other subjects: