I've been on this for awhile now, and i still have no idea what to do.
jesse played two days o...
Mathematics, 21.08.2019 13:30, kmetz07
I've been on this for awhile now, and i still have no idea what to do.
jesse played two days of golf. on the second day, he got a score of 6 below par, or -6. his total score for the two days was 0 above par, or 0. define a variable. then write and solve an equation to find the score jesse got on the first day. show your work.
Answers: 2
Mathematics, 21.06.2019 20:30, meowmeowcow
Given: klmn is a parallelogram m? n=3m? k, lf ? kn , ld ? nm kf=2 cm, fn=4 cm find: lf, ld
Answers: 1
Mathematics, 21.06.2019 21:00, palomaresmitchelle
Which expression is equal to (21)(7)(3x) using the associative property? (21 ยท 7 ยท 3)x (7)(21)(3x) 32(7 + 3x) (3x)(7)(21)
Answers: 2
Mathematics, 21.06.2019 21:30, mrlepreqon8897
Apool measures 100 meters by 100 meters a toddler inside the pool and trows a ball 60 centimeters from one edge of the pool. how far is the ball from the opposite edge of the pool
Answers: 1
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 23.12.2021 04:20