Mathematics, 03.07.2019 18:50, taelor32
What information is missing? a parking structure has 3 levels. there are 47 cars on the first level and 61 cars on the third how many cars are on the second level
Answers: 1
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 23:40, averycipher
Which point-slope form equation represents a line that passes through (3,-2) with a slope of -4/5
Answers: 1
Mathematics, 22.06.2019 00:00, andreaolvera
Add, subtract, multiply, or divide as indicated. list any restrictions for the variable(s) and simplify the answers when possible. 1) x-2 / x+5 + 3x / 2x-1 2) x+6 / x-6 - x^2 / x+6 3) x+9 / x-4 + x+2 / x^2-11x+28 4) x / x^2-64 + 11 / 2x^2+11x-40 5) 5 / x + 11 / x-3 - x-4 / x^2+2x-15
Answers: 1
What information is missing? a parking structure has 3 levels. there are 47 cars on the first level...
Chemistry, 26.07.2020 02:01
Chemistry, 26.07.2020 02:01